29 / 39
•
The raised roof must be lowered im-
mediately after loading / unloading.
Before Each Ride:
•
Snap the roof lift arm fully into place.
•
Lock the curtain tensioner.
The superstructure, tarpaulins
and curtains may be damaged
due to the rear panels and cur-
tain tensioners not being fully
opened prior to the operation
to lift the roof or change the
superstructure height. There-
fore, before the roof lifting
operations;
•
You have opened all the tarpaulin /
curtain tensioners,
•
Make sure you keep the rear panels
open.
Roof lift pump
Curtain tension lever