Kartsana SUPERBRAVO 2 Instruction Manual Download Page 18

OPERATING AND HANDLING OF 

SUPERBRAVO RAIL

 

 

Rev.2 
05-05-2023 

 

17 

4.4. Maintenance 

4.4.1. Precautionary Maintenance 

A periodic and correct maintenance guarantees the durability of the device.

 

Creating  a  maintenance  plan  including  periodic  check-ups  and  establishing  a  responsible 
employee to carry it out is recommended. 

The  person  who  carries  out  the  precautionary  maintenance  of  the  appliance  (user, 
manufacturer/supplier  or  third  party)  must  meet  or  adhere  to  the  following  basic 
requirements: 

 

 Possession  of  technical  knowledge  pertaining  to  the  device  and  of  the  periodic 

maintenance procedures as described in these instructions. 

 

 Use  or  support  of  qualified  technical  personnel  trained  specifically  in  the 

maintenance operations required for the device in question. 

 

 Use of components, replacement parts, or accessories that are either original to or 

approved by the supplier to avoid the need to carry out alterations or modifications to 
the device that would void warranty. 

 

 Record  keeping  of  all  maintenance  operations  carried  out  on  the  device,  in 

adherence to the instructions of European Council directive 93/42/CEE which states the 
obligation of the purchaser to provide when requested the afore mentioned after-sales 
care record for the purpose of product traceability. 

Check the device before every use. 

Before each service, the following points must be ensured: 

 

Functionality of the product. 

 

Fixation of nuts and bolts. 

 

Good condition of moving parts, wheels, belts, mattress. 

 

Spring sensibility. 

 

Full  working  order  of  all  electrical  functions  must  be  checked:  full  range  of 

movement, lighting, etc. 

If  the  device  does  not  appear  suitable  for  correct  and  safe  use,  it  must  be  taken  out  of 
service until the device is repaired or restored to full working order. 

Do not modify the device structurally for any reason, as this may cause serious damage to 
patients and / or operators. 

Recommended lubrication interval for moving parts: 

• 1 

- 30 services per month: every 3 months 

• 30

 - 50 services per month: every 2 months 

• over 1

50 services per month: every month 

Summary of Contents for SUPERBRAVO 2

Page 1: ...el Vall s BARCELONA 93 715 86 72 info kartsana com www kartsana com Superbrava Series SUPERBRAVO ELECTRIC RAIL Model R 2022 Read these maintenance instructions before using the product and keep them f...

Page 2: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 1...

Page 3: ...S 7 2 2 ASSEMBLING THE SUPERBRAVA STRETCHER ONTO THE SUPERBRAVO RAIL 9 2 3 LATERAL MOVEMENT SIDE PEDALS 12 3 1 VEHICLE S CONFIGURATION 13 3 2 FIXATION OF THE RAIL TO THE AMBULANCE 14 3 2 ELECTRICAL CO...

Page 4: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 3...

Page 5: ...to the rescue organization All its functions must be explained in detail The assistance organization must take charge of teaching all its employees how to use it correctly The product has a 24 months...

Page 6: ...ctions that must be carried out to use the product properly and maintain safe functionality 1 6 Summary of safety precautions Carefully read and strictly follow the warnings and cautions listed on the...

Page 7: ...hook does not damage or interfere with the brake lines oxygen lines fuel lines fuel tank or electrical wiring of the vehicle Before operating the rail clear any obstacles that may interfere and cause...

Page 8: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 7 2 INSTRUCTIONS MANUAL Only the SUPERBRAVA stretcher can be mounted on the SUPERBRAVO SUPERBRAVO Rail SUPERBRAVA stretcher...

Page 9: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 8 2 1 Technical specifications Weight 143 kg Maximum permissible load 400 kg Rail mesures in mm...

Page 10: ...e ambulance Place the front wheels half a centimeter above where the small loading wheels slide See picture The stretcher should be held in this position when it is removed from the rail Then look for...

Page 11: ...VO rail the SUPERBRAVO rail must be in the outer position of the ambulance Pull the red lever to release the block so that it can be removed Direct the stretcher towards the profiles protruding from t...

Page 12: ...so may damage important parts of the stretcher Pull the right rear red trigger on the rail to unlock the mechanism and push the stretcher towards the inside until it reaches the end of the stroke Onc...

Page 13: ...r battery to charge between services 2 3 Lateral movement side pedals To operate the lateral movement simply press any of the side pedals along the rail profile Once pressed the internal system is rel...

Page 14: ...ential for the appropriate use of the SUPERBRAVA TG 2022 The fixed part of the rail must be fixed at a minimum distance of 50 mm A from the rear door of the ambulance from the rectangular base of the...

Page 15: ...imply remove the 4 hexagonal screws at the ends and move the upper plate to release the profile The location of the drill holes is as follows see page 8 for clarification Once the plate is fixed the r...

Page 16: ...purpose of this connection is for the SUPERBRAVA stretcher to charge the battery when it is inside the ambulance It is recommended that this cable be protected on the outside with a plastic sheath to...

Page 17: ...amage the surface of the materials and wipe with a cloth or similar non abrasive cleaning utensil If the surface to be disinfected is greased re grease it after disinfection All disinfectants must be...

Page 18: ...odifications to the device that would void warranty Record keeping of all maintenance operations carried out on the device in adherence to the instructions of European Council directive 93 42 CEE whic...

Page 19: ...or ability to procure replacement parts from the original manufacturer or authorised by the manufacturer Use or support of specialized technical personnel trained by the manufacturer for the servicing...

Page 20: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 19 6 SUPERBRAVO RAIL EXPLODED...

Page 21: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 20...

Page 22: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 21...

Page 23: ...OPERATING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 22...

Page 24: ...ING AND HANDLING OF SUPERBRAVO RAIL Rev 2 05 05 2023 23 C Narc s Monturiol 34 08192 Sant Quirze del Vall s BARCELONA TEL 34 93 715 86 72 info kartsana com www kartsana com Technical Service sat kartsa...

Reviews: