background image

STEP    1

STEP    2

A

B

A

C

01

02

03

03

04

02

B

C

C

C

DIAGRAM #1

DIAGRAM #2

#

1

First layout the basket tubes per Diagram #1. Position bent end sections         with "Safari Logo"         

        facing up and mounting tabs         on side sections          facing in, per Diagram. 

It is recommended to 

       cover the entire joint surfaces with silicone

  ( for 'BUSHMAN' only)

 and then insert section         into 

       section         positioning mounting flange         to the inside of flange         . 
        Align holes and start all eight screws         before final tightening to insure all holes are properly aligned.

B

B

C

A

A

01

02

03

04

SIL

ICO

NE

D

D

G

H

F

E

KM

KM

FRONT OF VEHICLE

SECTION "05"

On Jeep sport bar mount racks 
(part no. 50031 or 50241) the 
distance from the flange nut hole 
to the end of the floor tube is not 
the same. Be sure the shorter 
distance is towards the front of 
the vehicle.

NOTE:

KM

KM

FRONT
OF
VEHICLE

#

1

Next insert floor tubes        through cross members         making sure tapered edges on 

SECTION "05"

 are

  facing the same direction. Align holes in tube       with holes in section       and insert button head bolts        
  and press nuts        into bottom of tubes        , (as per diagram) and tighten. Now insert plugs         into ends of 
   floor  tubes        , it is recommended to apply Magic Lube into the ends of the floor tubes before inserting.

G

E

E

E

E

F

H

D

D

SIL

ICO

NE

SIL

ICO

NE

SIL

ICO

NE

Reviews: