
For Technical Support Call: 800-343-7486 Monday-Friday 7AM - 4 PM (PST)
Page 6
Installation Instructions
–
4A93L
Step 4
–
Install Torque Tube
•
If EXT is needed, Assemble EXT to long torque tube.
•
If EXT is not needed, Only use long torque tube.
•
Bolt torque tube to front and rear bow using 1/4"-
20 x 1” Hex Head bolt, two 1/4" flat
washers and 1/4"-20 nyloc nut at each location.