CV
Clamp Pads
(-034)
Tube Assembly
(-020)
(b)
(c)
Pad Bracket
(-026)
STEP 9
Now install ladder into desired position with ladder rung firmly against the
clamp pads. Now adjust front pad bracket (-026) firmly against rung. It may
be necessary to move pad bracket (-026) to align with one of the two square
holes in the bow. Note: position pad bracket (-026) so adequate pressure is
applied to ladder rung when rotating handle (-002). Ladder should be
clamped
firm
with no movement when handle is in lock position. Tighten all
hardware.
DIAGRAM 7a
Handle
(-002)
Pad Bracket
(-026)
(Existing 40853)
Curb Side
DIAGRAM 7
Pad Bracket
(-026)
(a)
(b)
(c)
STEP 8
Install pad bracket (-026) using 1 each 3/8 x 1
carriage bolt (m), 1each 3/8 flat washer (b), 1
each 3/8 nylock nut (c) shown in
[DIAGRAM 7]
.
Do not tighten for later adjustment.
Now install the clamp pads (-034) to pad
bracket (-026) and tube assembly (-020) per
[DIAGRAM 7a]
using 2 each 3/8 washers (b)
and 2 each 3/8 nylock nuts (c). Do not tighten.