
Instructions – 40601SH
Page 7
Mark onto the B-pillar
and roof support the
location of all the
slots and holes in the
top and sides of the
partition panels.
Ensure this is the location
of where you want the
partition to be installed.
Set partition assembly
aside.
Installing Plus Nuts
DO NOT drill beyond depth of B-pillar or upper installation surface. When installing
hardware through any installation surface, always ensure the area behind the
installation surface is clear of electrical wiring, fuel tank or lines, or any vehicle safety
features.
At each marked location, drill hole using 25/64” drill bit and appropriate sized drill-bit stop collar. If
25/64” drill bit is not available, a 3/8” drill bit can be used, although it may be necessary to tap in plus
nuts.
Screw 1/4” x 2-1/4” hex head bolt through 1/4” flat washer and plus nut installation tool, and then into
plus nut. Knurled end of plus nut tool must be directed away from bolt head and contacting plus nut.
Insert plus nut into hole with plus nut tool attached.
Using the 9/16” box wrench, hold the plus nut tool stationary and then tighten hex head bolt until plus
nut is tightly gripping and does not spin when hex bolt is loosened.
DO NOT overtighten plus nut.