Karel PG100-CU Technical Reference And User'S Manual Download Page 3

 TECHNICAL REFERENCE AND USER’S GUIDE  

REVAAA

INTERNAL PAGER SYSTEM CONTROL UNIT

II

PREFACE

Chapters  in  this  guide  have  been  prepared  in  order  to  present  detailed  technical 

information  to  people  who  need  hardware-based  information  about  the  PG100-CU 

Internal Pager System Control, and instructing them for installation of the PG100-RF. 

By  this  way,  one  could  understand  abilities  of  the  device,  how  it  will  be  operated  in 

accordance with customer demands and things that should be done in order to operate 

it with full performance.

The  first  chapter  -  “Technical  Introduction"  It  contains,  technical  information  about 

hardware and software structures of the device. Information in this chapter for which 

knowledge  in  mechanics,  electricity  and  electronics  may  be  prerequisite,  aims  to 

introduce structure of the device. Presentation of the information in this chapter follows 

a path from the whole of the device down to the details of parts. 

The second chapter - “Installation” - This chapter tells about the installation methods of 

the device. This chapter definitely must be read before the installation by the personnel 

who will perform the installation of the device.

The thind chapter - “Use” - This chapter explains the things to be done in order to put 

the device in use.

Best regards,

Karel.

III

CONTENTS

TECHNICAL  INTRODUCTION:

..............................................................................................

1

   

INTRODUCTION  TO  THE  PG100-CU  UNIT:

............................................................

1

   

PARTS  LIST  ON  DELIVERY:

.....................................................................................

2

 

COMPATIBILITY:

..................................................................................................

2

 

TECHNICAL SPECIFICATIONS:

..................................................................................

2

INSTALLATION:

...............................................................................................................

3

   

PREPARATION:

..................................................................................................

3

   

APPLICATION:

.................................................................................................

3

   

WIRING OF THE PG100-CU UNIT:

.............................................................................

4

   

Power  Connection:

.................................................................................................

4

   

PG100-RF Connection:.....................................

......................................................

4

   

Exchange Connection:

.............................................................................................

5

USE:

...............................................................................................................

6

Reviews: