8
English
5.906-485.0 Rev. 00 (05/09)
1
Fastening screws of the casing top
2
Housing top
3
Bearing bowl incl. spring clamp and switch cams
4
Bearing bowl incl. spring clamp
Pull the bearing bowls off to the side.
Unscrew locking screws.
Remove the top part of the casing.
1
Suction turbine
2
Power cord
3
Terminal strip of the suction turbine
4
Connection cable to the brush head
5
Connection cable of the suction turbine
Remove the suction turbine.
Pull the connecting cable of the suction turbine out of the termi-
nal strip.
Install the new suction turbine in reverse sequence.
Note:
The mains cable must be routed as shown in the illustration
within the respective pins (see arrows).
1
Casing bottom
2
Power cord
3
Seal
Remove the seal.
Insert new seal.
Note:
The seal must be placed precisely into the guide groove of
the casing bottom to protect the suction turbine from contamina-
tion.
5.10 Replace seal
1
2
3
4
5
1
2
3
6
Maintenance and care