K&N Fuel injection perfomance kit Generation 2 Installation Instructions Download Page 2

INSTALLATION INSTRUCTIONS

Continued

7.  Release the 2 clips which reatins the airbox lid 

then remove the lid from the vehicle.

8.  Remove the three nuts that retain the airbox 

bottom to vehicle. 

9. Remove airbox bottom from vehicle as shown.

NOTE: K&N Engineering, Inc., recommends 

that customers do not discard factory air 

intake.

10.  Remove the 8mm bolt that retains the radiator 

fan shroud to radiator.

11.  Install the provided bracket (07879) onto 

radiator with the provided hardware.

12. Install the two provided brackets onto the 

factory rubber mounted studs with the provided 

hardware.

Note: Install bracket (07093) onto the lower 

rubber mounted stud.

13.  Install edge trim onto heat shield as shown. 

Trim if needed.

14.  Install the heat shield into vehicle and attach to 

the two outter brackets.

15.  Using the provided hardware, assemble the 

saddle bracket assembly as shown.

16.  Install the saddle bracket assembly onto the 

heat shield as shown.

17.  On vehicles that come with external temp 

sensor drill out the drill point with a 3/4 drill, then 

install the provided grommet as shown.

18.  Install the provided silicone hump hose 

(087121) onto the K&N

®

 intake tube with the 

provided hose clamps.

19.  Install the K&N

®

 intake onto the throttle body 

and line it up with saddle bracket assembly.  

Note: Do not tighten completely.

20.  Remove the four bolts that retain the mass air 

sensor to the airbox lid, then remove the mass air 

sensor from lid. 

21.  On vehicles that come equipped with an 

external temp sensor, twist counter clockwise to 

remove from airbox lid. 

22.  Assemble the filter adaptor onto the mass air 

sensor with the  provided hardware as shown.

23.  Install the silicone hose (08690) onto the mass 

air sensor with provided hose clamps as shown.  

Reviews: