Venkon XL
Beschreibung
Assembly, installation and operating instructions
11
3
Transport, storage and packaging
3.1
General transport instructions
Check on delivery for completeness and transport damage.
Proceed as follows in the event of visible damage:
Do not accept delivery or only accept with reservations.
Record any transport damage on the transportation documents or on the transport company's delivery note.
Submit a complaint to the freight forwarder.
IMPORTANT NOTE!
Warranty claims can only be made within the applicable period for complaints. (More information is avail-
able in the
on the Kampmann website)
IMPORTANT NOTE!
2 people are needed to transport the unit. Wear personal protective clothing when transporting the unit.
Only lift the unit on both sides and not by the pipes / valves.
IMPORTANT NOTE!
Material damage caused by incorrect transport!
Units being transported can drop or topple over if transported wrongly. This can cause serious material
damage.
Proceed carefully when unloading the equipment on delivery and when transporting it on site and note
the symbols and instructions on the packaging.
Only use the holding points provided.
Only remove packaging shortly before assembling the unit
3.2
Scope of delivery
IMPORTANT NOTE!
Check the scope of delivery!
Check the delivery for damage.
Check that the articles and type numbers are correct.
Is the delivery and number of items delivered correct?
Summary of Contents for Venkon XL
Page 2: ......
Page 5: ...5 13 2 ERP Datenblatt Venkon XL 70...
Page 67: ...Venkon XL Beschreibung Assembly installation and operating instructions 67 13 Certificates...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...www kampmanngroup com hvac products fan coils venkon xl 02 20 ENSAP Nr 1374732...