REMARKS:
- the appliance must be installed by a qualifi ed technician
in possession of the technical and professional
requirements according to the DM37/2008 that, under its
responsibility, to ensure compliance with the rules of good
technique.
- the boiler must be connected to a heating system and/or
to a network of production of sanitary hot water, consistent
with its performance and its power
- you need to keep in mind all laws and national, regional,
provincial and municipal laws of the country in which you
installed the device
- check that the fl oor is not fl ammable: if necessary use a
suitable platform
- in the room where the generator must be installed to
heat must not pre-exist or be installed with an extractor
hood or ventilation ducts of the collective type.
Should these devices be located in adjacent rooms
communicating with the installation, and ‘prohibited the
simultaneous use of the heat generator, where there is a
risk that one of the two rooms being placed in depression
than the other
- it is not permissible to install in bedrooms or bathrooms
- for hydraulic connections (see next chapter) it is advisable
to use where possible of hoses
- the boiler is equipped with a fl ue gas fans for the
extraction of exhaust gases and works in depression with
respect to the combustion chamber;
- the boiler works with low fl ue gas temperatures. During
installation take adequate measures to prevent the
formation of condensation.
40 cm
40 cm
Distance to objects
The boiler should be inspected on all sides, so you have to
keep a distance of at least 40 cm at the back and sides. It
is also recommended to keep the pellets and all fl ammable
materials at a suitable distance