INSTALLATION INSTRUCTIONS
Freestanding Bath
1271911-2-
C
Questions? Problems? For additional assistance, please contact KALLISTA’s Customer
Service Department at 1-888-4KALLISTA (1-888-452-5547) or kallista.com.
3 of 5
1. PREPARE THE SITE
1-1/2"
(38 mm)
Drain
Pipe
Finished Floor
NOTICE:
Provide adequate floor support.
NOTICE:
Measure your product for site preparation. Visit the product page at www.kallista.com for more information.
Determine the location of the bath.
Position the bath so that it is oriented as desired, with the overflow side of the bath facing the preferred direction.
Make sure the subfloor offers adequate support for your bath.
Ensure the subfloor is level.
IMPORTANT!
To ensure a successful installation, it is critical that you install the bath on a level finished floor.
Install the finished floor material.
Make sure the finished floor is level before proceeding.
Position and install a standard PVC or brass bath drain pipe. Install the drain pipe so it extends 1-1/2” (38 mm)
above the finished floor.