- 8 -
removing
the power board, start servicing at least 2 minutes after the main power has been
turned off.
• While the main power is on, do not touch any parts or circuits other than the ones
specified.
If any connection other than the one specified is made between the measuring
equipment and the high voltage power supply block, it can result in electric shock or
activation of the leakage-detection circuit breaker.
• When installing the LCD module in, and removing it from the packing carton, be
sure to have at least two persons perform the work.
• When the surface of the panel comes into contact with the cushioning materials, be
sure to confirm that there is no foreign matter on top of the cushioning materials
before the surface of the panel comes into contact with the cushioning materials.
Failure to observe this precaution may result in, the surface of the panel being
scratched by foreign matter.
• When handling the circuit board, be sure to remove static electricity from your body
before handling the circuit board.
• Be sure to handle the circuit board by holding the large parts as the heat sink or
transformer. Failure to observe this precaution may result in the occurrence of an
abnormality in the soldered areas.
• Do not stack the circuit boards. Failure to observe this precaution may result in
Summary of Contents for K-LED32HDZT2
Page 1: ...LCDTelevision KALLEY Service Manual Product Ver 1 0 May 2015 K LED32HDZT2...
Page 11: ...11 TV Front...
Page 12: ...12 TV Back...
Page 13: ...15...
Page 14: ...17 2 4 Remote control...
Page 31: ...34...
Page 32: ...35 7 Schematic circuit diagram 8 Explode View...
Page 42: ......