
www.bathe.net.au | 25 John Street, Leichhardt, NSW, 2040 | t. +61 2 9509 0000 | [email protected]
1.
I M P O R T A N T !
M a k e s u r e t h e f l o o r i s
l e v e l .
2.
Install legs on bath as per the manufacturer’s
instructions.
Note: Leg system may differ to image.
3.
Fit waste and overflow fittings, as per the
manufacturer’s instructions.
4.
With panel in place (not fixed), adjust leg
height to base of panel plus 2 mm, to allow for
sealant.
5.
Position bath with tile trim fitted as per
instructions provided.
Tile trim profile
6.
Prepare floor outlet and connect the flexible
waste.