BASIC OPERATION
• Wheel size:
26”
• Required hydraulic oil:
DTE24
• Spindle size:
1”
• Spindle RPM:
1760 RPM
1. AIR IN
: Connect DRY shop air to the regulator (0-55 PSI MAX).
2. OIL RESERVOIRS:
Dual oil reservoirs use DTE24 hydraulic oil. Maintain an
oil level of 1/4 full in one reservoir and 3/4 full in the other.
NOTE: oil
levels alternate with cycle.
3. SAW HEAD RETURN:
Adjust the steel plate
(#70)
by loosening the knob
(#71)
. When the plate
(#70)
contacts, the air valve saw head will
return to the top position.
4. FEED RATE VALVE:
Rotate the feed rate valve to desired down feed
speed. Rotate clockwise for a slow feed rate and counterclockwise
for a faster feed rate. Total closure of the feed rate valve will stop the
down feed cycle.
5. V-BELTS:
New v-belts will stretch and must be checked and tightened
(if necessary) after a half-dozen cuts. Don't over-tighten the v-belt
optimal squeeze is roughly 1/4" between the top and bottom of the v-
belts.
6. MAINTENANCE:
Thoroughly clean the machine after ever shift to
maintain optimal machine operation.
HOOK UP
BE SURE OF CORRECT AC POWER TO MACHINE. DRILL NEMA BOX FOR
SEALTITE FITTINGS AROUND INCOMING WIRE. CONNECT AC POWER TO L1,
L2 , L3 ON CONTATOR. IF NOT FAMAILIAR WITH ELECTRICS CONTACT A
CERTIFIED ELECTRCIAN. FACTORY ISN’T RESPONSIBLE FOR INCORRECT
ELECTRICAL HOOKUP BY CUSTOMER.
Summary of Contents for K26S
Page 5: ......