Replace lubrication 

 
required equipment: 

  Lever grease press for taper lubricating nipple (K&K item 5200732) 

  Fluid grease for K&K swing joints (K&K item 5200733) 

  Ladder 

  Cleaning rags/paper towels 

  Allen key (wrench size 5 mm) 

 

The lubricant must comply with Kaiser & Kühne specifications. 

 

Annexion A2  

 

Replace lubrication at least every 6 months 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Procedure: 

Lube point 1: 

1.  Remove the screw plug 1 with an 

Allen key size 5 mm (do not lose the 

sealing ring). 

2.  Press lubricant into the grease nipple 

using a lever grease press until fresh 

lubricant emerges from bore 1. 

3.  Pick up escaping old lubricant with 

e.g. cleaning rags and dispose of it 

properly. 

4.  Insert screw plug 1 and tighten firm-

ly. 

Lube point 2: 

5.  Remove the screw plug 2. 
6.  Press lubricant into the grease nipple 

using a lever grease press until fresh 

lubricant emerges from bore 2. 

7.  Pick up escaping old lubricant with 

e.g. cleaning rags and dispose of it 

properly. 

8.  Insert screw plug 2 and tighten firm-

ly. 

Grease nipple 

Connection for 

grease press 

Lube point 1  

Discharge opening 

Screw plug 1 

Bore 1 

 

Lube point 2  

Discharge opening 

Screw plug 2 

Bore 2 

 

Summary of Contents for Single point swing

Page 1: ...Freizeitger te GmbH 2019 09 10 Im S dloh 5 D27324 Eystrup Telefon 0 42 54 93 15 0 Fax 0 42 54 93 15 24 E Mail info kaiser kuehne play com M A I N T E N A N C E I N S T R U C T I O N S Single point sw...

Page 2: ...s such as welding can only be performed by qualified professionals or require machining by the manufacturer dis tributor o The owner operator of the playground should set up a suitable inspection plan...

Page 3: ...on Check playground equipment including all components and construction elements above and below the playing level for damage caused by wear vandalism weather events rotting corrosion and element form...

Page 4: ...ng Item 040710004 Page 4 of 10 Annexion A1 Visual inspection of swivel at least once a month Check for visibility of the red coloured warning groove Dismount the swing joint of the playground equipmen...

Page 5: ...ubrication at least every 6 months Procedure Lube point 1 1 Remove the screw plug 1 with an Allen key size 5 mm do not lose the sealing ring 2 Press lubricant into the grease nipple using a lever grea...

Page 6: ...40710004 Page 6 of 10 Annexion E1 Spare parts Item Qty Title Illustration 1060841 1 Single point swing assembled steel beam L approx 5 42 m W approx 0 60 m H approx 0 18 m Weight approx 253 kg 1060147...

Page 7: ...I O N S Single point swing Item 040710004 Page 7 of 10 3430018 8 Hexagon cap nut M16 for installation of universal joint 1060829 1060693 4 U Link of universal joint 2030204 4 Dog point screw M16x25 st...

Page 8: ...430010 8 Hexagon cap nut M8 DIN 986 A2 for U Link 6 mm 1060742 015753 stainless steel chain 1 4310 nominal size 7 0 mm material sold by meter 1060180 1 Rubber bump stop for K K Single point swing stee...

Page 9: ...9 of 10 3400381 4 Hexagon screw M20 x 35 DIN 933 for installation of ground fixing 1060148 3430027 4 Washer 21 DIN 125 for installation of ground fixing 1060148 1060033 2 support for K K Single point...

Page 10: ...kaiser kuehne play com M A I N T E N A N C E I N S T R U C T I O N S Single point swing Item 040710004 Page 10 of 10 3300010 8 Cap grey SKS 16 for installation of support 1060033 5200733 1 Fluid grea...

Reviews: