Page 18
Installation
Overview
Installation Summary - Indoor Unit
Select Installation Location
Attach Mounting Plate
Determine Wall Hole Position
1
2
3
Drill Wall Hole
4
12cm
(4.75in)
2.3m (90.55in)
12cm
(4.75in)
Mount Indoor Unit
STEP
8
Wrap Piping and Cable
(not applicable for some locations in North America )
Connect Piping
Prepare Drain Hose
Connect Wiring
(not applicable for some
locations in North America )
4
5
6
7
8
9
Distance from ceiling is determinded
by the installation method.
FROM EDGE TO HOLE CENTER:50mm
FROM EDGE TO HOLE CENTER:100mm
150
100
100
100
50
50
50
2
2
2
4
4
4
6
RECOMMAND
LIQUID
GAS
BUBBLE
LEVEL
mm
inch
mm
inch
Summary of Contents for KRP-09MEGI
Page 39: ......