Parts List
AB
CD
EF
G
H
I
J
K
Left Steel PanelRight Steel PanelRear Steel PanelFloorSupport FeetLeft PanelBack PanelRight PanelFront PanelRoofRamp
C
A
B
F
D
E
WWW.K9-KENNELSTORE.COM
2
Page 1: ...use personal protective equipment such as gloves and safety glasses to avoid the risk of injury Make sure the floor you step on is dry free from any liquids such as oil and water when assembling this...
Page 2: ...s List A B C D E F G H I J K Left Steel Panel Right Steel Panel Rear Steel Panel Floor Support Feet Left Panel Back Panel Right Panel Front Panel Roof Ramp C A B H F G D I J E E K WWW K9 KENNELSTORE C...
Page 3: ...hinge center in the hinge hole provided Do the same thing between parts B and C so that they form like the letter U A B 1 2 C Assembling Instruction WWW K9 KENNELSTORE COM 3 D Place the D section on t...
Page 4: ...into the round cavity that meets between F and G Insert the H leg into the available hollow of part C Put the metal hinge center in the hinge hole that meets the G hinge hole 1 2 3 How to open the doo...
Page 5: ...which is the roof Attach the bolts to the four corners as the handle Bolt K D Put the K section which is the footing for your pet to be able to climb the kennel Install the bolts in the two holes pro...