8 For Professional Technical Support call 1-844-242-2475
Deep Well Application Only
(4” Or larger Well)
1.
Install
1-1/2in.Brass Foot Valve
to
1-1/2in. × 3in.
Galv. Steel Nipple
. Connect nipple/foot valve
assembly to bottom of ejector body. Next install plastic
nozzle and venturi into top of ejector body. All
connections must be watertight for pump to operate
correctly. (Fig. 1)
Note:
Select the nozzle and Venturi in different depth of
water below the chart.
Double pipe jet package chart
Model
No.
HP
Max Depth to water in FT.
Depth
limit
nozzle Venturi
Depth limit
nozzle Venturi
3/4
25-70
#51 J32P-24
70-90
#54 J32P-20
1
25-70
#51 J32P-24
70-110
#54 J32P-20
2.
Install a
1-1/4in. PVC MPT×S Male Adapter
on
ejector body over the plastic venturi. Then install a
1in.
× 3in. Galv. Steel Nipple
in ejector body, followed by
a
1in.PVC FPT×S Female Adapter
. Cement 1in.and
1-1/4in.PVC rigid pipes into the adapter. (Fig. 2)
3. Install 4in.
well seal
over 1in. and 1-1/4 in. PVC rigid
Pipe
. Position the foot valve at least 5 feet above bottom of
well and 10 feet below the well’s water level. Cut top of
1in.
PVC rigid Pipe
and
1-1/4in. PVC rigid Pipe
compatibly
f
or next installation step
as shown in the installation
diagram. (Fig. 3)
4. Cement
1in.PVC 90-Degress S×S Elbow
to the top of
1 in. PVC rigid Pipe
. Cement
1-1/4in. PVC MPT×S Male
Adapter
to the top of
1-1/4 in. PVC rigid Pipe and
Install
1-1/4in. PVC TEE FPT×FPT×FPT
to adapter.
One end of
horizontal port install another
1-1/4in. PVC MPT×S Male
Adapter
.Completed installation is shown. (Fig. 4)