Step 8
Notes:
The pulley on the Front Press Base (
6
) should be enclosed by two Pulley Covers (
63
).
1. According to the cable diagram, sequentially use 4 x Pulleys (
62
), 2 x Pulley With Cover (
63
),4 x M10
×
90mm Allen Bolts (
85
), 1 x M10×150mm Allen Bolt (
86
), 1 x M10×55mm Allen Bolt (
90
), 12 x M10
Washers (
100
), 2 x Ø30×Ø 10.5mm Washers (
61
) , 6 x M10 Aircraft Nuts (
102
) ,6 x M10 Spring
Washers (
99
) and 2 x Double Floating Pulley Bracket (
28
) to connect Upper Cable (
37
), refer to
Diagram
8-A
.
2. Secure the Pulley (
62
) using 2 x Double Floating Pulley Brackets (
28
), 1 x M10×55mm Allen Bolt (
90
),
2 x M10 Washers (
100
), 1 x M10 Spring Washer (
99
),1 x M10 Aircraft Nut (
102
), 2 x Cable Retainers
(
43
) and 2 x Cable Retainer Bushings (
107
), refer to Diagram
8-B
.
3. Insert the Weight Selector Pin (
36
) into the hole of the selected weight plate, put the key ring on the
Selector Rod (
19
), and connect the end with thread head of the Upper Cable (
37
) to the Selector Rod
(
19
), refer to Diagram
8-C
.
Summary of Contents for JXL-1150
Page 5: ...Components Fixings 1...
Page 6: ...Components Fixings 2...
Page 7: ...Components Parts 1...
Page 8: ...Components Parts 2...
Page 18: ......
Page 28: ...Explosion diagram...
Page 37: ...Parts List...
Page 38: ......
Page 39: ......