Section 28.23.29 Video Surveillance Remote Devices and Sensors
© Copyright 2011
, Victor Company of Japan, Limited. All rights reserved. “JVC” is the trademark or registered trademark of Victor Company of Japan.
All non-metric weights and measures are approximate. Features and specifications are subject to change with out notice.
MasterFormat, SectionFormat and PageFormat are trademarks of the Construction Specification Institute.
10 of 11
VN_H217U/VPU_V.1_00
1.
Engage Installer with [license] [certification] [
specify
type
] as required by the [State of] [City
of] with demonstrated successful experience designing, installing, commissioning, training
and servicing closed circuit television systems
2.
Installer shall have completed factory approved training and be certified by the manufacturer
as qualified to install, operate and maintain product(s) specified
B.
Install the system in accordance with the equipment manufacturers recommended procedures
C.
Install system using generally acceptable industry practices for closed circuit television systems
D.
Install system using generally acceptable industry practices for network appliances
E.
Ensure system and network configuration is fully coordinated with the Owner’s Information
Technology Department.
Specifier Note: The following may be deleted for projects of smaller scope in which full Division 1 project
documentation is not provided or required. It is recommended that performance requirements be specified within the
project documentation to ensure proper configuration and operation of the system. Contact your JVC Representative for
assistance in developing a system performance specification specific to a particular project.
F.
Ensure system and all related components are configured to support performance requirements
outlined in Division 1, 01.86.33 Electronic Safety and Security Performance Requirements
3.02
EXAMINATION
Specifier Note: There are often changes to building interior structures during the course of construction. It is imperative
as built mounting locations be assessed to ensure the desired field of view can be achieved. Owners often require very
specific views of their facility and physical changes to the structure may prevent ideal mounting locations. Coordinate
and/or revise Division 1, Section 01 86 33 Electronic Safety and Security Performance Requirements
A.
Verification of Conditions:
1.
Ensure wiring cable chase requirements are available
2.
Ensure substrate for physical mounting locations meet manufacturer recommendations
B.
Examination and Assessment:
3.03
FIELD QUALITY ASSURANCE
A.
Provide Manufacturer Field Engineering Support for engineering, installation, testing and
commissioning assistance as required in Division 1.
3.04
COMMISSIONING
Specifier Note: The following may be deleted for projects of smaller scope in which full Division 1 project
documentation is not provided or required. It is recommended that performance requirements be specified within the
project documentation to ensure proper configuration and operation of the system. Contact your JVC Representative for
assistance in developing performance specification specific to a particular project.
A.
Testing: Ensure system operates to manufacturers specifications