4-10
DECK MECHANISM DISASSEMBLY
Gear Assembly P3
Gear Assembly P2
Base Assembly P2
Base Assembly P3
(A)
(B)
Chassis
Gear Assembly P2 Hole
Gear Sector Hole(A)
Plate Slider Hole(B)
Lever Spring Boss
Gear Assembly P3 Hole
Fig. A-8
29. Gear Assembly P2 (Fig. A-8-1)/
Gear Assembly P3 (Fig. A-8-2)
1) Just lift the Gear Assembly P2 up.
2) Just lift the Gear Assembly P3 up.
NOTE
When reassembling, align the two holes of the Gear
Assembly P2 and P3 in a straight line after confirmation
whether the Gear Sector Hole(A) and the Plate Slider
Hole(B) are aligned or not as Fig.
30. Base Assembly P2 (Fig. A-8-3)/
Base Assembly P3 (Fig. A-8-4)
1) Move the Base Assembly P2 in direction of arrow(A)
along the guide hole of the Chassis and disassemble it
on bottom side.
2) Move the Base Assembly P3 in direction of arrow(B)
along the guide hole of the Chassis and disassemble it
on bottom side.
(Fig. A-8-1)
(Fig. A-8-2)
(Fig. A-8-3)
(Fig. A-8-4)
Summary of Contents for HR-XV2EK
Page 3: ...SECTION 1 SUMMARY CONTENTS Safety Precautions SPECIFICATIONS 1 5 ...
Page 80: ...3 38 3 39 5 SCART JACK CIRCUIT DIAGRAM 03 4 7 SR14505B VJW602CP s ...
Page 85: ...3 48 3 49 PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD LOCATION GUIDE ...
Page 96: ... 02 12 04 R17149A COMBI NS DAP202K 3 74 3 75 6 JACK CIRCUIT DIAGRAM ...
Page 101: ...LOCATION GUIDE 3 84 3 85 PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD TOP VIEW ...