2-3
2.2 Setup with patch cords and jig connector cables
Note:
Fig. 2-2-1 shows an example of expansion setup that facilitates inspection of major boards because main components are
connected by means of patch cords and jir cables.For proceeding to electrical adjustment in such the setup, disassemble the
set at certain level required for the current adjustment objectives referring to the section 1 "DISASSEMBLY" and properly set
up the expanded set and test instruments.
MENU
VIDEO
DIGITAL
DC
5V
PRINTER
OP BLOCK/CCD
MON/REG
MON/REG
JACK
MAIN
STROBE
MONITOR
OPERATION UNIT
Personal computer
MIC
CN9001
CN7101
CN101
CN6501
CN6601
CN2001
CN3002
CN501
CN5501
CN3001
CN2002
CN4001
CN502
CN2501
YTU94077-12
YTU94074-12
1
2
YTU94126B-80
6
YTU93106A
3
YTU94077-28
4
YTU94077-38
YTU94077-22
YTU94071-22
5
Fig. 2-2-1
Connection
1
MAIN CN4001
OPRATION UNIT
12
YTU94077-12
FPC wire
YTU94074-12
FPC CN.ASSY
2
MAIN CN3001
MON/REG
CN9001
80
YTU94126B-80
B TO B CN.ASSY
3
MAIN CN2001
CCD
CN1001
28
YTU94077-28
FPC wire
4
MAIN CN5501
JACK
CN101
38
YTU94077-38
FPC wire
5
MAIN CN501
OPUNIT
22
YTU94077-22
FPC wire
YTU94074-22
FPC CN.ASSY
6
MAIN CN2202
30
YTU93106A
JIG CN.cable
Pin No.
Parts Number