5. Drive Tube Installation
Remove one Nut M8 (40) ,one Washer Ø8* Ø16*1.5 (41) ,one Bolt M8*50 (66) from the Foot Turn
Tube Assembly (64).
Attach the Left Drive Tube(7) on the Left Foot Tube (5) with one Nut M8 (40) ,one Washer Ø8*
Ø16*1.5 (41) ,one Bolt M8*50 (66) that were removed.
Cover a Cap Nut S13(65) onto the Left Drive Tube(7).
Repeat above step to the Right Foot Tube (6) on the Right Drive Tube(7) and Cover a Cap Nut
S13(65) .
6. Left/ Right Foot Tube Installation
Remove two Bolts M8*16(23) ,two Spring Washers Ø8* Ø25*2.0 (54) ,one Connecting rod shaft
Ø19*61 (68)from the Left Foot Tube (5).
Pls note coat the Connecting rod shaft Ø19*61 (68) with Grease.
Attach the Left Foot Tube (5) on the Left Swing Tube (3) with two Bolts M8*16(23) ,two Spring
Washers Ø8* Ø25*2.0 (54) ,one Connecting rod shaft Ø19*61 (68) that were removed.
Note :Aim the Connecting rod shaft(68) in the direction of the notch.
Repeat above step to the Right Foot Tube (6) on the Right Swing Tube (4).