6.2    change vacuum pump oil 

Use  the  original  pump  oil  or  oil  recommended  by 

manufacture 

 

When  the  oil  level  in  vacuum  pump  is  reach  the  minimum  position, 

pump  oil  should  be  refilled.  If  the  oil  level  is  too  high,  it  should  be 

drained by unfastening the draining screw

 

 

System could accumulate the vacuum time. When the value reaches 

to 150 hours, system would prompt changing the pump oil. The alarm 

information  would  be  displayed  when  the  power  is  on  and  system 

would not start vacuum process. 

 

When the color of pump oil is changed to white, it should be changed. 

Change stage

 

1

Before changing, run the vacuum process for 1 minute to be sure that 

the pump is in hot condition. 

                  Open the draining screw to drain the oil into a container. 

  2

  Unfasten the oil entrance lid and add oil into the pump until the oil level 

is higher than the minimum position, fasten the screw. 

  3

  Switch the power on and press the 

“▲”`“▼” key in same time to enter 

reset  menu,  select  3.Vacuum  pump  and  press  start/stop  key  to   

reset the pump oil working time. 

 

6.3 Digital weight scale calibrating: 

After  changing  the  refrigerant  cylinder,  or  the  digital  weight  scale  is 

used for a long time, the weight scale displaying weight is different with 

the  real  value.  It  could  be  corrected  by  calibrating  the  weight  scale 

precision and cylinder weight. At first be sure that no refrigerant is in 

cylinder. 

Press “▲”`“▼” key at same time to enter reset menu. Press 

menu key

  to 

select “weight scale” item and press “▲”`“▼” 

Summary of Contents for JLY530

Page 1: ...Guangzhou Junliye Import Export Co Ltd Phone 0086 20 86394322 WEBSITE www 431tool com JLY530 AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM OPERATION MANUAL Index...

Page 2: ...tion 3 4 1 Function 3 4 2 Main device 4 4 3 Control panel 4 4 3 1 Keypad 5 4 4 Inner structure 5 5 Basic operation 6 5 1 What should we do when we use a new machine 6 5 2 Manual Operation 8 5 3 Automa...

Page 3: ...efore operation Don t refill R134a to the storage cylinder for more than 8KG in order to avoid the serious accident result from over high pressure Don t put the hose near rotation and heating automobi...

Page 4: ...ylinder capacity 10Kg Speed of recovering 250g min Speed of refilling 800g min Net weight 90Kg Size mm 640 740 1240mm 4 Function 4 1 Function Recover and purify refrigerant into cylinder Vacuumize the...

Page 5: ...u Junliye Import Export Co Ltd Phone 0086 20 86394322 WEBSITE www 431tool com 4 4 3 Control panel 4 3 1 Keypad Control panel Oil bottles Figure 1 Figure 2 LP Gauge HP Gauge Cylinder pressure gauge LCD...

Page 6: ...nner structure 5 Basic Operation 1 Increase parameter 2 Decrease parameter 3 Menu Enter function menu 4 Start Stop Start stop process 5 Oil inject Oil inject To set and calibrate select process Vacuum...

Page 7: ...connect rapid service couplers to hoses 1 Press one time of these two key at the same time And LCD reads like that in this picture SETTING UNITS KG 2 Press five times of this menu key until LCD reads...

Page 8: ...couplers connect the machine low side hose to the NEW R134a tank b Run the VACUUM process for 1 minute Please DON T open the manual valve on NEW R134a cylinder when do vacuum c Set the recovery amount...

Page 9: ...r charged or set the time you want to do vacuum or recycle then press to run It will show the real weight or real time it has done And press again will stop the process Remark Recycle means to repurif...

Page 10: ...50KPA you cannot do vacuum The system will indicate PRESSURE EXISTS You need to do recovery or release the gas from the A C system 3 Turn on the quick couplers quick couplers when doing recovery and c...

Page 11: ...f you don t inject oil within 20 seconds it will indicate that AUOT 1 COMPLETE And you can inject oil before it jumps to 20S Keep you finger on key and the oil will be injected Keep an eye on the bott...

Page 12: ...g the dryer and filter System could not start any process at this time Changing stage 1 Check the pressure If the pressure is higher than 200Kpa please recover the refrigerant in hoses 2 Remove the ba...

Page 13: ...changing run the vacuum process for 1 minute to be sure that the pump is in hot condition Open the draining screw to drain the oil into a container 2 Unfasten the oil entrance lid and add oil into th...

Page 14: ...EBSITE www 431tool com 13 key at same time again till reset is displayed Press at the third time to reset weight scale Guangzhou Junliye Import Export Co Ltd ADD Baiyun District Guangzhou China Tel 86...