Table 7: Site Preparation Checklist (continued)
Date
Performed by
For More Information
Item or Task
Verify that there is appropriate clearance in
your selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
SSR120 Site Guidelines and Requirements
IN THIS SECTION
General Site Installation Guidelines | 21
Site Electrical Wiring Guidelines | 21
Chassis Physical Specifications for SSR120 | 22
Environmental Requirements and Specifications for SSR120 | 22
Clearance Requirements for Hardware Maintenance of SSR120 | 23
Requirements for Mounting an SSR120 Appliance on a Desktop or Other Level Surface | 24
Rack Requirements for SSR120 | 24
20
Summary of Contents for SSR120
Page 1: ...SSR120 Hardware Guide Published 2022 01 17 ...
Page 48: ...3 Verify that all four Device interfaces are up 48 ...
Page 54: ...Lithium Battery Declaration 87 ...
Page 56: ...56 ...
Page 60: ...Restricted Access Warning 60 ...
Page 72: ...Unterminated Fiber Optic Cable Warning 72 ...
Page 78: ...Jewelry Removal Warning 78 ...