RELATED DOCUMENTATION
SRX550 Services Gateway Chassis | 14
SRX550 Services Gateway Cabinet Airflow Requirements | 48
SRX550 Services Gateway Spacing of Mounting Bracket and Flange Holes | 44
SRX550 Services Gateway Rack Size and Strength Requirements | 43
Clearance Requirements for Airflow and Hardware Maintenance of the SRX550 Services Gateway | 45
SRX550 Services Gateway Cabinet Airflow Requirements
When you mount the SRX550 Services Gateway in a cabinet, you must ensure that ventilation through
the cabinet is sufficient to prevent overheating. Consider the following when planning for chassis cooling:
•
Ensure that the cool air supply you provide through the cabinet can adequately dissipate the thermal
output of the services gateway.
•
Install the services gateway as close as possible to the front of the cabinet so that the cable management
system clears the inside of the front door. Installing the chassis close to the front of the cabinet maximizes
the clearance in the rear of the cabinet for critical airflow.
•
Route and dress all cables to minimize the blockage of airflow to and from the chassis.
RELATED DOCUMENTATION
SRX550 Services Gateway Chassis | 14
SRX550 Services Gateway Cabinet Size and Clearance Requirements | 47
SRX550 Services Gateway Spacing of Mounting Bracket and Flange Holes | 44
SRX550 Services Gateway Rack Size and Strength Requirements | 43
Clearance Requirements for Airflow and Hardware Maintenance of the SRX550 Services Gateway | 45
48
Summary of Contents for SRX550
Page 1: ...SRX550 Services Gateway Hardware Guide Published 2020 12 16...
Page 55: ...39...
Page 178: ...162...
Page 182: ...Restricted Access Warning 166...
Page 196: ...Jewelry Removal Warning 180...
Page 199: ...Operating Temperature Warning 183...
Page 206: ...190...
Page 210: ...194...
Page 213: ...197...