Table 11: Site Preparation Checklist for SRX550 Services Gateway Installation (continued)
Notes
Date
Performed
By
Additional Information
Item or Task
Review the maximum
distance allowed for
each cable. Choose the
length of cable based on
the distance between
the hardware
components being
connected.
Plan the cable routing
and management.
RELATED DOCUMENTATION
SRX550 Services Gateway Chassis | 14
Installation Overview for the SRX550 Services Gateway | 60
General Site Installation Guidelines for the SRX550 Services Gateway | 35
General Site Installation Guidelines for the SRX550 Services Gateway
The following precautions help you plan an acceptable operating environment for your SRX550 Services
Gateway and avoid environmentally caused equipment failures:
•
For the cooling system to function properly, the airflow around the chassis must be unrestricted. Allow
sufficient clearance between the front and back of the chassis and adjacent equipment. Ensure that
there is adequate circulation in the installation location.
•
Follow the ESD procedures to prevent any damage equipment. Static discharge can cause components
to fail completely or intermittently over time. For more information, see Preventing Electrostatic Discharge
Damage to the SRX550 Services Gateway.
•
Ensure that the blank panels are installed into empty slots to prevent any interruption or reduction in
the flow of air across internal components.
35
Summary of Contents for SRX550
Page 1: ...SRX550 Services Gateway Hardware Guide Published 2020 12 16...
Page 55: ...39...
Page 178: ...162...
Page 182: ...Restricted Access Warning 166...
Page 196: ...Jewelry Removal Warning 180...
Page 199: ...Operating Temperature Warning 183...
Page 206: ...190...
Page 210: ...194...
Page 213: ...197...