
Site Preparation Checklist for EX4650 Switches
The checklist in
summarizes the tasks you need to perform to prepare a site for
installing an EX4650 switch.
Table 23: Site Preparation Checklist
Date
Performed by
For More Information
Item or Task
Environment
Environmental Requirements and
Specifications for EX Series
Switches
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure the distance between external
power sources and the switch installation
site.
Locate sites to connect system grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
•
Verify that the rack meets the minimum
requirements for installing the switch.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
57
Summary of Contents for EX4650 Series
Page 1: ...EX4650 Switch Hardware Guide Published 2019 10 10 ...
Page 17: ......
Page 55: ......
Page 78: ......
Page 105: ......
Page 126: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the EX4650 Components 131 ...
Page 127: ......
Page 133: ......
Page 151: ...Restricted Access Warning 155 ...
Page 166: ...Jewelry Removal Warning 170 ...
Page 169: ...Operating Temperature Warning 173 ...
Page 178: ...DC Power Disconnection Warning 182 ...
Page 182: ...DC Power Wiring Sequence Warning 186 ...