7.2
EJC 212z / 214z / 216z / 220z
Load handler emergency lowering
Requirements
– Load handler is not in the rack.
Tools and Material Required
– Key (SW8)
– Torque wrench setting range 1-4 Nm
Procedure
• Park the truck securely, see page 84.
• Open the front panel, see page 185.
• Loosen the lock nut (75) on the valve block.
• Remove the valve screw (76) in stages (anti-clockwise).
The load handler is lowered.
Z
After the emergency lowering insert the valve screw (76) as far as the stop (1.5 Nm
+0.5 Nm) and secure with the lock nut (75).
75
76
116
04.19 en-GB
Summary of Contents for EJC 212z
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 10: ...10 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 27: ...EJC 212z 214z 216z 220z D 25 04 19 en GB ...
Page 50: ...48 04 19 en GB ...
Page 74: ...72 04 19 en GB ...
Page 135: ...Z This setting can be changed if required 133 04 19 en GB ...
Page 193: ...Z After adding hydraulic oil tighten the lock to 10 Nm M 10Nm 191 04 19 en GB ...
Page 195: ...115 113 114 112 193 04 19 en GB ...
Page 226: ...02 16 EN 6 ...
Page 228: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 250: ......