
10. Attach the other three Pole(16,17) in the same way.
See inset drawing.
10
19
11. Lay out Top G3 Pole (18), joint each section
Connector to a straight line as shown.
Assemble the remaining Top G3 Pole (18) in the
same way.
Spread the Netting (20) on the trampoline bed,
insert a Top G3 Pole (18) into the opening of
Top Sleeve on the Netting (20). Insert the
other Top G3 Pole (18) into the opposite
opening of Top Sleeve on the Netting (20).
,QVHUWWKHSROHLQWRVOHHYHRIWKH1HWWLQJ
D
1HWWLQJ
2SHQLQJ
-RLQWWKHHQGRIHDFKSROHE\&OLSRI&RQQHFWRU
6WDUW
)LQLVK
'RRURI1HWWLQJ
7RS6OHHYH
12. Joint each end of Top G3 Pole (18) by the clip of
connector at each opening. The Top Sleeve of the
Netting (20) become a round shape.
Summary of Contents for Orbounder 12ft Combo YJ
Page 1: ...YJ USA Corp 3970 Lindbergh Drive Adison TX 75001 WARNING www jumppod com 877 928 8777...
Page 2: ...3...
Page 5: ...6 Note The...
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ...the sharply spot...
Page 11: ......
Page 12: ......
Page 13: ......