background image

Part 16

Part 15

Swing Seat assembly

Using swing seat rail (Part 15), slowly insert it through any webbing on seat surface (Part 16), being 

careful to insert it thoroughly through every webbing.

Continue looping the 3 remaining swing seat rails (Part 15) until they are looped within the webbing

Next, take the larger swedge on seat rail (Part 15) and connect it with the smaller swedge on the 

next one, until all are connected, making a full connected circle frame.

- Insert the screw (Part 18) into the center hole of cover (Part 22).

Take ropes (Part 14) and loop it through screw set for swing seat toprail (Part 18) (4 Sets).

Take screw sets with ropes connected (Part 18) and insert them to the corresponding holes where 

swing seat toprail (Part 15) align with each other, and screw them together using the provided Allen 

Key.

- Close the cover (Part 22) by velcro tape.

Take each carabiner and attach it to the round ring (Pre-Assembled on rope).

15

Rope 

Part 14

Part 22

Part 22

Part 22

Part 18

Insert the screw to the cover (Part 22).

Close the cover (part 22) by 

velcro tape.

Rope 

Part 14

Part 22

Step 5

Summary of Contents for JKBKUFO-V2

Page 1: ...st follow all instructions and warnings while using this equipment Do not use this swing on hard packed soil concrete or any kind of hard surface This equipment must be anchored You should consult you...

Page 2: ...ded rubber for equipment up to 8 feet high or sand or pea gravel for equipment no more than 5 feet high as shock absorbing material Dirt and grass which are the most prevalent surfaces under home play...

Page 3: ...IMPORTANT CONSUMER INFORMATION SHEET 7 CARE AND MAINTENANCE CHECKLIST 8 TOOLS NEEDED 10 PARTS LIST 11 12 ASSEMBLY AND INSTALLATION INSTRUCTIONS 13 FRAME ASSEMBLY 13 SWING SEAT ASSEMBLY 15 COMPLETE SWI...

Page 4: ...d must be leveled prior to installation Installation on sloping or uneven ground will put stress on the joints causing the unit to become loose and unstable which may result in serious injuries Remove...

Page 5: ...his may cause injuries ALWAYS guide children to sit in the center of swinging part with their full weight placed in the seat center and holding on to the swing chains or ropes DO NOT allow children to...

Page 6: ...s and corners Replace if they are loose cracked or missing Check all moving parts including swing seats ropes cables and chains for wear rust or other deterioration Replace as needed Check metal parts...

Page 7: ...what surfacing material is used We recommend that a shock absorbing material should extend a minimum of 6ft in all directions from the perimeter of stationary the UFO swing However because children m...

Page 8: ...ll protective surfacing materials to prevent compaction and to maintain appropriate depth Replace as needed ONCE A MONTH DURING PLAY SEASON Lubricate all metallic moving parts per manufacturer s instr...

Page 9: ...ats tested to provide impact protection equal to or greater than the height of the play equipment Equipment Maintenance Periodically check nuts bolts caps swing seats suspension ropes chains and cable...

Page 10: ...10 Description Mallet May be needed for installing anchor TOOLS NEEDED Please gather the following tools prior to assembling this equipment TOOLS INCLUDED TOOLS NOT INCLUDED...

Page 11: ...3 12 75mm dia x 8 34mm inner dia Spring washer 4 15 44mm dia x 14 51mm inner dia Nut Quantity 4 sets Description 1 50mm x 8mm Screw C 2 18 23mm dia x 8 11mm inner dia Washer 3 12 75mm dia x 8 34mm inn...

Page 12: ...s will allow for adjustments during installation After you have finished assembling the main components of the swing go back and fully tighten all nuts Check the entire unit and make sure all parts ar...

Page 13: ...parallel tubes Part 5 A and 6 B marking Next connect bottom straight pole Part 7 C marking with another bottom straight pole Part 8 D marking by inserting Screw D Part 12 using Allen Key Part 21 provi...

Page 14: ...Allen Key provided Step 4 Assembly the top frame cover Follow the diagrams below to assembly the top frame cover part 23 14 Top frame cover Olive hook Lay ceiling frame Part 1 upside down with the tub...

Page 15: ...nected circle frame Insert the screw Part 18 into the center hole of cover Part 22 Take ropes Part 14 and loop it through screw set for swing seat toprail Part 18 4 Sets Take screw sets with ropes con...

Page 16: ...2 carabiners on central hook Front Back Motion Connect one carabiner to the left hook and the other to the right hook to create a swinging motion Complete Swing Set Please note you must maintain a min...

Page 17: ...ng is assembled and placed on level ground Dig holes around swing leg tube as shown in drawing in the next page As you dig deeper enlarge the diameter of the hole to fix the cement Place 2 inches of b...

Page 18: ...r the date of purchase The frame is warrantied for 12 months after the date of purchase All products for which a warranty claim is made must be filed online and accompanied by sufficient proof of purc...

Reviews: