– 20 –
2-15 Handling the cords
1) Bring the cords under the table into the control
box.
2) Put the cord brought into the control box through
cord exit plate
❶
and fix cable clip band
❷
.
3) Install control box cover
❸
with four setscrews
❹
.
Arrange the cord so that it is not tensed
or hitched even when the machine head is
tilted. (See
A
section.)
For the purpose of preventing the cord
breakage, take care not to allow the cords to
be caught between the control box and con
-
trol box cover
❸
when attaching the latter.
DANGER :
1. To prevent personal injuries caused by electric shock hazards or abrupt start of the sewing machine,
carry out the work after turning OFF the power switch and a lapse of 5 minutes or more.
2. To prevent accidents caused by unaccustomed work or electric shock, request the electric expert or
engineer of our dealers when adjusting the electrical components.
➡
A
❷
❶
❹
❸
2-15-1. Handling the cords coming from the control box
1) Fix cord
❷
coming from control box
❶
for the
stitch skipping detecting device and tube
❸
coming from the solenoid valve to the table with
accessory cable clip
❹
and wood screw
❺
as
illustrated in the figure.
In addition, fasten cord
❷
and tube
❸
with ac-
cessory two 10 mm long cable clip bands
❻
as
illustrated in the figure.
2-15-2. Handling the cords coming from the control box for stitch skipping detecting device
❹
❸
❺
❻
❷