– 106 –
The machine uses the following two fuse.
Both are the same fuses.
CTL PCB
❶
For 85V power supply protection
5A (time-lag fuse)
❷
For 24V power supply protection
5A (time-lag fuse)
DANGER :
1. To avoid electrical shock hazards, turn OFF the power and open the control box cover after about five
minutes have passed.
2. Open the control box cover after turning OFF the power without fail. Then, replace with a new fuse with
the specified capacity.
7-4. Replacing the fuse
❶
❷
WARNING :
To protect against possible personal injury due to abrupt start of the machine, be sure to start the
following work after turning the power off and ascertaining that the motor is at rest.
7-3. Applying grease
1. When the machine needs replenishment of grease, an alarm sounds. Once
the alarm sounds, replenish grease. In the case the machine is used under
harsh environment, it is recommended to replenish grease once a year for
ensuring effective greasing.
2. Do not apply oil to the sections which are lubricated with grease.
3. Be aware that grease can leak from the thread take-up cover and needle bar
if the amount of grease is excessive.
4. Be sure to use JUKI GREASE A TUBE
❶
(part number : 40006323).
❶