– 3 –
1
2
3
5
4
6
(4) Setting the production management function
The operaton and the dsplay-related basc tems of the producton management functon can be set on the
<Producton management functon settng screen> under the nformaton mode.
The producton management functon screen dsplays the target producton volume for gven workng hours
and the actual number of sewn products to notfy the operator of a delay or progress of hs/her sewng work
n real tme.
The target producton volume s calculated n two dfferent methods. The method can be changed over usng
swtch
1
for settng the target producton volume count-up method.
1
Counting up the target production volume according to the lapse of a specified pitch time
: Countng up accordng to the target ptch tme
2
Calculating the target production volume as of the current time of day according to the specified
starting/finishing times of day of work and total production volume
: Calculatng from the workng tme of day
: Calculatng from the workng tme of day 2
: Calculatng from the workng tme of day 3
(4)-1 In the case of counting up the target production volume according to the pitch time
The target production volume is counted up according to the lapse of a specified target pitch time.
<production management function setting screen (in the case of count-up according to the pitch time>
Input data on tems
2
to
4
referrng to the table gven n the next tem.
When Screen closng swtch
6
s pressed, the screen s closed and restored to the prevous screen.
When Clear swtch
5
s pressed, the target ptch tme, target producton volume for a day and the current
target producton volume can be totally cleared.
<production management function setting screen>
* Refer to
. 2-2. displays on the screen for the production support function"
cedure to be taken untl ths screen s dsplayed.