GuestCall Extreme Coaster Paging System
Quick Setup Guide
1
800-321-6221
ISTATION / TXGCIQ
NEO10
Transmitter
Setup
Components
1.
Transmitter with power supply & antenna
2.
Coaster Charging Base with power supply
3.
GuestCall Extreme Coaster Pagers
Equipment Setup
Step 3
Plug the power supply (ACCHPS) into the charging base and then into a
standard 110-240v outlet.
For systems with more than 15 pagers (up to 60 pagers total), use the
jumper cable (ACCHWIRE) to daisy chain the charging bases together.
Step 4
Add pagers to the charging base. You will see a RED light on each
pager. This light indicates the charging status.
•
“
LO
” indicates battery below 20%
•
Solid RED
indicates pager is charging
NOTE: A surge protector is recommended for all Transmitters and Charging Bases.
Step 1
Connect the antenna to the transmitter. Twist to lock in place.
Step 2
Plug the power supply (ACCHPS) into the transmitter and then into a
standard 110-240v outlet.
2.
1.
3.
Charging Base
Setup
ACCHWIRE