1-3
1
1-2-3 Functional requirements of LRIT terminal
By addition of MSC.242(83), MSC.263(84), SOLAS V 19-1
(1)
It can be sent LRIT information with 6 hours intervals automatically.
(2)
It can be control the sending intervals (15 minutes to 6 hours) by remote control from the land.
(3)
It can be sent LRIT information by polling.
1-3 LRIT operation
LRIT information can be sent by Inmarsat-C Position Data Reporting service
*(1)
.
Prepare following matters for LRIT operation preliminary.
(1) To utilize Position Data Reporting service, download Data Network ID (DNID), and program of Data
Report from LES via satellite.
(2) Turn ON the Enhanced Data Reporting (EDR) function (default value at the shipment is ON).
* (1) Position Data Reporting service utilizes data reporting procedure which is specified by Inmarsat.
Items of the service are:
•
Sending Position Data Reporting to the specified LES periodically with following the schedule with
using DNID.
•
Sending Position Data Reporting even the polling is sent from LES.
•
The sending schedule can be changed from LES via satellite.
•
Particular operation for MES equipment is not necessary.
*(2) EDR is the Data Reporting service, which has delivery confirmation system with re-send function.
Summary of Contents for JUE-95LT -
Page 2: ......
Page 16: ...1 4...
Page 21: ...2 5 2 2 2 3 Coaxial cable CFQ 5924A3 Fig 2 2 3 Coaxial Cable...
Page 25: ...2 9 2 2 4 2 EME NAF 253LT Fig 2 4 2 EME NAF 253LT Unit mm Mass Approx 2 4 kg Color N9...
Page 26: ...2 10 2 4 3 IME NTF 782LT Fig 2 4 3 IME Unit mm Mass Approx 1 3kg LT LT LT LT LT...
Page 29: ...2 13 2 2 5 2 EXT PSU NBD 843A Fig 2 5 2 EXT PSU NBD 843A Unit mm Mass Approx 8kg...
Page 30: ......
Page 46: ......
Page 48: ......
Page 49: ......