![JR Transrotor ZET 1 Operating Instructions Manual Download Page 3](http://html1.mh-extra.com/html/jr/transrotor-zet-1/transrotor-zet-1_operating-instructions-manual_2028117003.webp)
3
Setup
Start with the setup of the system where the turntable will finally be placed,
because you cannot transport the system afterwards easily. To avoid finger prints
on the plexiglas, please put on the delivered cotton gloves.
1.
Align the three spike bases in a triangular shape on the table.
2.
Put the turntablechassis with the spikes into the cavity of the spike bases
3.
ZET 1 and ZET 3 only
The spikes can be adjusted with the three aluminium buttons.
4.
Put the motor precisely onto the very back chassis bulge.
5.
Take the turntable out of the packaging and put it onto the main bearing.
6.
Now put the belt around the turntable and the drive disk.
Upper running grooves (small diameter)=33 1/3 rotation
Under running grooves (great diameter)=45 rotation
8.
Put the plug of the motor cable into the power supply unit. Connect the power
supply unit with the electricity system. Generally, the power supply unit can
remain connected with the electricity as the power consumption is very low
when the motor is switched-off. In case of longer non-utilisation please
disconnect the power supply unit from electricity.
9.
Connect the NF-cable with both cinch plugs to the phono inlet of the amplifier:
red=right channel
black=left channel
10.
The adjustment of the tonearm can be taken from the separate manual
instruction of the tonearm.
11.
Please take the data and setup instructions of the system from the separate
manual instruction.