
Attach tie rod and front whees
3
3
1
for
wa
rd
1. Install the shaft of outer tie rod end-1 to stub axle,R
from the underside (nut on top).
2. Install flat washer,spring washer then tighen nut.
Note: don't adjust outer tie rod end as wheel alignment is done before packing.
3. Attach the wheel(27*8-12),FR-2 on the hub, tighten the nuts.
4. Attach the wheel(27*8-12),FL-3 as described above .
Attach tie rod end and front wheel
Q'ty
Description
code name
2
1
1
1
tie rod end
2
1
D650.05.01.03.00
stub axle,R
tie rod end
S650.03.01.04.00A
right wheel(27*8-12)
left wheel(27*8-12)
S650.03.01.01.00A
02.S650.03.01.01A
02.S650.03.01.04A
02.D650.05.01.03
Erp code
No.
Summary of Contents for JNSZ650DLB
Page 6: ...Warranty policy...
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 57: ...Figure 75...
Page 60: ...Parts manual CYLINDER BLOCK PART...
Page 88: ...Frame 24 23 25 20 21 22 1 2 3 4 5 6 7 8 9 10 12 11 13 15 14 16 17 18 19...
Page 127: ...Preparation attach instruction Remove packing...
Page 129: ...front shock absorber stub axle Attach...
Page 131: ......
Page 134: ......
Page 136: ...Attach rear shock absorber and rear wheel...
Page 141: ...Attach seats and safety belt...
Page 142: ...check vehical...