UK Manufactured Unvented Hot Water Cylinder Installation Guide
53
Taking The Cylinder Out Of Use
Shutting Down
•
Ensure the cold water supply is isolated and at least two hot water draw off points are open prior to
draining the cylinder.
•
One of the hot water draw off points should be as close as possible to the height of cylinder in draw off
terms.
•
Where applicable use the drain valve at the cold water inlet to drain the contents of the cylinder.
•
Isolate the coil from the main heating system. If necessary blow out the coil prior to moving the cylinder.
Recycling And Disposal
The cylinder or any of its components must not be disposed of in domestic rubbish. The material in the cylin-
der, packaging and components contain recyclable materials and they should be disposed of properly and
in accordance with national regulations.
Guidance In The Event Of A Problem
If you have a problem in the first year within the warranty period, contact the plumber who fitted the unit.
Thereafter contact the plumber who carries out the annual servicing for you. If your cylinder develops a
leak we will supply you with a new one. We ask for a nominal upfront payment to prevent fraud and we will
require the original unit to be returned to us for inspection along with a copy of your Service Log Book. If it is
confirmed that it has failed within the terms of the guarantee your upfront payment will be refunded.
Log Book
The installer must comply with all of the installation instructions contained within this installation manual. On
completion of the initial installation and after each subsequent annual service the Benchmark Log Book must
be completed and signed by the competent person who has worked the unit.
The purpose of Benchmark is to ensure that customers have the correct equipment for their requirements
installed in accordance with the manufacturer’s installation instructions. The equipment must be installed by
installers who have completed an accredited competent person’s scheme and who install, commission and
service the equipment in accordance with the manufacturer’s instructions.
All installations must comply with the appropriate Building Regulations and the Benchmark Log Book should
be provide to the customer. The Benchmark Log Book can also be used to show that all equipment is in-
stalled in accordance with the relevant Building Regulations.