Pipework & Liquids

Is anti freeze being used as the solar system fluid?

(confirm)

Ensure solder joints are not used throughout ther entire system

(confirm)

Ensure high temperature insulation is used throught all pipe work in solar system

(confirm)

Ensure white paste and hemp is used on all fitting connections throughout

(confirm)

Ensure you use Joule copper overflow and discharge vessel to recover fluid from safety valve

(confirm)

 

Water Quality

Water sample visually inspected and no signs of contamination visible

(yes/no)

When installing the solar system it is important to check the quality of the existing incoming water to the hot 

water cylinder. If you are in doubt as to its purity a sample should be sent off to the department of health 

for testing.

Fire Safety

Ensure that there is no obvious risk to fire prevention by installing the solar system.

(confirm)

Ensure that all wires are not in direct connection with any un-insulated pipe work or plant that could cause a 

risk of burning

(confirm)

Legionella / Bacterial Growth

Ensure that there is no dead legs in the existing plumbing system that could induce the growth of legionella.

(confirm)

Ensure that the stats controlling the boiler and the stat controlling the immersion are set to 60 °C or above.

(confirm)

Ensure that the client understands the risk of legionella and the standard procedures for reducing the risk 

of it forming. Also ensure that the client understands that you are their to install a solar thermal system and 

that you do not take any responsibility for auditing their hot water system for risk of legionnella forming. 

That you will endeavour to minimise the risk of it forming by the work that you carry out but any existing 

risk should be dealt with a certified professional.

(confirm)

 

7

NAVITAS IN-ROOF

  

 

installation manual   

Summary of Contents for Navitas In-roof

Page 1: ...NAVITAS IN ROOF joule navitas solar in roof flat panel installation manual INSTALL...

Page 2: ...Installer Loyalty Scheme Coming Soon 2...

Page 3: ...erview of materials 14 Overview of materials single row 16 Overview of materials double multiple row 17 Overview of tools 18 Mounting single row 34 Mounting double multiple row 43 Specifications 44 Pu...

Page 4: ...nd manifold boxes should be transported horizontally Heavy goods should not be loaded on top of the kit boxes Care should be taken when opening boxes to prevent scratches or sudden shocks to the glass...

Page 5: ...Required No of people using hot water in the house Any other exceptional water loads in the dwelling No of People Solar Cylinder Size Size of Flat Panel System Size of Evacuated Tube 2 Panel System 4m...

Page 6: ...n take the anticipated load Where there is signs of discolouration a closer examination will be requried If black spots are found on the timber this indicates a leak which needs attention If the timbe...

Page 7: ...isk to fire prevention by installing the solar system confirm Ensure that all wires are not in direct connection with any un insulated pipe work or plant that could cause a risk of burning confirm Leg...

Page 8: ...Kit Components Solar Pump Solar Controller Solar Expansion Vessel Standard Kit Components Solar Panel Profiles Piping Options DN16 Duo Pipe DN20 Pipe Stainless Tails Copper Solar Fluid 8...

Page 9: ...Mounting Options Optional Accessories Installation Hose Mounting Set Over Voltage Lightning 3 4 Thermostatic Mixing Valve Cooling Vessel Discharge Vessel 9 NAVITAS IN ROOF installation manual...

Page 10: ...nel mbar Vissolis 4 Panel mbar Vissolis 6 Panel mbar 2 120 15 8 54 1 18 4 11 3 180 15 12 57 2 87 10 74 4 240 15 17 08 2 36 8 22 5 300 22 21 11 4 05 14 58 6 360 22 25 14 5 74 20 94 8 240 22 33 68 6 92...

Page 11: ...oof fixing kits for metal and other commercial roofs Two options available utilise appropriate clamps so the fabric of the metal roof is not penetrated see page xx Note the minimum and maximum distanc...

Page 12: ...Overview of materials Single row R1 double multiple row R2 12...

Page 13: ...13 NAVITAS IN ROOF installation manual...

Page 14: ...Overview of materials Single row R1 14...

Page 15: ...15 NAVITAS IN ROOF installation manual...

Page 16: ...Overview of materials Double multiple row R2 16...

Page 17: ...Overview of tools 17 NAVITAS IN ROOF installation manual...

Page 18: ...Mounting Single row R1 18...

Page 19: ...19 NAVITAS IN ROOF installation manual...

Page 20: ...Mounting Single row R1 20...

Page 21: ...21 NAVITAS IN ROOF installation manual...

Page 22: ...Mounting Single row R1 22...

Page 23: ...23 NAVITAS IN ROOF installation manual...

Page 24: ...Mounting Single row R1 24...

Page 25: ...25 NAVITAS IN ROOF installation manual...

Page 26: ...Mounting Single row R1 26...

Page 27: ...27 NAVITAS IN ROOF installation manual...

Page 28: ...Mounting Single row R1 28...

Page 29: ...29 NAVITAS IN ROOF installation manual...

Page 30: ...Mounting Single row R1 30...

Page 31: ...31 NAVITAS IN ROOF installation manual...

Page 32: ...Mounting Single row R1 32...

Page 33: ...33 NAVITAS IN ROOF installation manual...

Page 34: ...In roof installation Double multiple row R2 34...

Page 35: ...35 NAVITAS IN ROOF installation manual...

Page 36: ...In roof installation Double multiple row R2 36...

Page 37: ...37 NAVITAS IN ROOF installation manual...

Page 38: ...In roof installation Double multiple row R2 38...

Page 39: ...39 NAVITAS IN ROOF installation manual...

Page 40: ...In roof installation Double multiple row R2 40...

Page 41: ...41 NAVITAS IN ROOF installation manual...

Page 42: ...In roof installation Double multiple row R2 42...

Page 43: ...Stainless Steel Pipe Specification Silicone Cable Specification Insulation Specification Specifications 43 NAVITAS IN ROOF installation manual...

Page 44: ...8 Insulating EPP box cover Connections of flow and return pipe work to the pump station are made vis the flat face thread connection on all points apart from the connection directly underneath the pum...

Page 45: ...the pump station consideration should be given to future access for maintenance It is best practice to locate the pump as far downstream the system as possible away from the collectors to help reduce...

Page 46: ...ould be located at least 100 mm from in sulated pipes which may become hot during operation Control panels use PT1000 sensors containing twin core copper cable with a 0 75mm cross section The sen sors...

Page 47: ...47 NAVITAS IN ROOF installation manual...

Page 48: ...48...

Page 49: ...49 NAVITAS IN ROOF installation manual...

Page 50: ...Commissioning 50...

Page 51: ...e until the desired flow rate is achieved Stop the pump Turning The Solar Pump On Manually For Service Press the left or down button the controller until the screen displays the time Press and hold th...

Page 52: ...ass of the refractometer will display the level of antifreeze in the system If the antifreeze has lost its antifreeze properties the system should be refilled with fresh solar fluid It is recommended...

Page 53: ...of inspection Expansion vessel setting before filling System pressure Expansion vessel setting before filling Flow rate Antifreeze level pH reading Inspection of barium get ter on tubes Engineer deta...

Page 54: ...54...

Page 55: ...55 NAVITAS IN ROOF installation manual...

Page 56: ...E info joule ie W www joulesolutions ie JOULE UK A Newport Business Park Newbridge Road Ellesmere Port Cheshire CH65 4LZ T t 44 0 1513 551 094 F 44 0 1513 568 336 E info jouleuk co uk W www jouleuk c...