![Jøtul GF 400 BF CE2 Installation And Operation Instructions Manual Download Page 13](http://html1.mh-extra.com/html/jotul/gf-400-bf-ce2/gf-400-bf-ce2_installation-and-operation-instructions-manual_2037803013.webp)
13
139810_R4 GF 400 BF CE
2
7/18
Figure 7. Flueing Configurations.
Flue Arrangement 1
Vent Restriction Position D
(Fully Open).
Flue Arrangement 2
Vent Restriction Position C
Flue Arrangement 3
ANY VERTICAL TERMINATION:
Vent Position B
Figure 7 a.
Figure 7 b.
Figure 7 c.
600mm maximum horizontal run if verticle rise
is between 500-995mm, (600mm is the supplied
attached terminal length).
500mm
minimum
rise
Figure 8.
Push the
Pivot Pin into
the slot
Default
Factory
Setting is
“D”
Front of Stove