Page - 19 -
Generally, Jotron uses pluggable screw terminals, these are durable and both easy to install and
service.
8.5
Fastening
All cables and conductors should be clamped to the structure with cable ties.
8.6 Preservation
Prior to, during and after the installation is complete the equipment surfaces are to be protected against acid holding
fluids, pollution, moisture and impacts.
Failure to perform preservation protection of the equipment can result in equipment damages and
will void your Jotron warranty.
8.7
Screen connection
For maximum performance after installation, it is necessary to terminate the cables and ground the screens.
8.8 Cable requirements for power lines
Ensure that the cable used is approved in accordance with Jotron specification.
Power cable should be individually twisted pair and the minimum conductor size must be 1 mm
2
.
To prevent disturbance and noise caused by interference, do not combine different systems in the
same cable.