2
Initial Checklist
When you are ready to start, make sure you have the right tools
to hand, plenty of space and a dry area for assembly.
This product must be connected to a water supply in
accordance with the Water Supply (Water Fittings) Regulations
1999, and UK Building Regulations. If you are in any doubt
about these requirements, contact a qualified plumber, your
local Water Company or the Water Regulations Advisory
Service (WRAS).
It is important to that both supply pipes are flushed before
connecting the
filler
to ensure no pipe/plumbing debris
entering the valve.
TURN OFF WATER MAINS SUPPLY. The mains stopcock is usually
situated where the supply enters the building.
It is also recommended that the water heating arrangements
are turned off.
Isolate the hot and cold water supply.
M
ax
imum water pressure to
filler
i
s
5
bar.