background image

3170 Wasson Road  •  Cincinnati, OH  45209  USA

Phone 513-533-5600  •  Fax 513-871-0105

[email protected]  •  www.jordanvalve.com

I & M Mark 58/586 (Air Loaded) Series

Installation & Maintenance Instructions for 

Mark 58/586 Back Pressure Regulating & Relief Valve

Warning:

 Jordan Valve back pressure regulators must only be used, installed and repaired in accordance with these 

Installation & Maintenance Instructions. Observe all applicable public and company codes and regulations. In the 
event of leakage or other malfunction, call a qualified service person; continued operation may cause system failure 
or a general hazard. Before servicing any valve, disconnect, shut off, or bypass all pressurized fluid. Before disas-
sembling a valve, be sure to release all spring tension.

Please read these instructions carefully!

Your Jordan Valve product will provide you with long, 
trouble-free service if it is correctly installed and main-
tained. Spending a few minutes now reading these in-
structions can save hours of trouble and downtime later. 
When making repairs, use only genuine Jordan Valve 
parts, available for immediate shipment from the factory.

Ideal Installation

1.  To protect the valve from grit, scale, thread chips, 

and other foreign matter, all pipe lines and piping 
components should be blown out and thoroughly 
cleaned before the valve is installed.

2.  Shutoff valves, pressure gauges, and bypass piping 

should be installed as indicated in the diagram to 
provide easier adjustment, operation, and testing.

3.  A line strainer should be installed on the inlet side of 

the regulator to protect it from grit, scale and other 
foreign matter. A 0.033 perforated screen is usually 
suitable. Line strainers are available from Jordan Valve.

4.  For best control, 3’0” straight sections of pipe should 

be installed on either side of the valve.

5.  Install the regulators in the highest horizontal line of 

piping to provide drainage for inlet and outlet pip-
ing, to prevent water hammer, and to obtain faster 
regulation.

6.  The regulator may be installed in a flow-through 

manner as in Figure 1 or into a tee off of the main 
line (with one port plugged) as shown in Figure 2. 
Flow may be in either direction through the body of 
the regulator. Bypassed fluid exits out of the bottom 
bypass port.

7.  In hot vapor lines, upstream and downstream piping 

near the regulator should be insulated to minimize 
condensation.

8.  Expand the outlet piping at least one pipe size if the 

outlet pressure (downstream) is 25% of the inlet 
pressure or less. As standard tapered expander con-
nected to the outlet of the regulator is recommend-
ed. Minimizing bypass piping length and number of 
elbows will improve valve performance by reducing 
pressure buildup.

9.  Where surges are severe, a piping accumulator is 

recommended.

 

Condensate 

Return

6

1  Inlet shut-off valve

2  MK 58 BPRV

3  Strainer and Drain Valve

4  Pressure Gauge

Ideal Installation

4

4

2

1

6

7

5

3

Main Line

Main Line

Condensate 

Return

By Pass

3

6

5

1

4

2

7

4

8

By Pass

5  Steam trap and valve

6  Manual bypass valve

7  Bypass shut-off valve

8  Pipe plug

Reviews: