5
Device overview
JOKE
®
i nstructi on manual
Fi ne dry blasti ng uni t mi kromat 600 eco
9
Installation and starting the unit for the first time
Installation site
The unit must not be installed in an environment where there is a risk
of explosion or in rooms with a risk of explosion.
The unit must not be installed in damp rooms or in rooms with high
relative humidity.
Machine connections
Only connect the unit via a plug connector that allows disconnec-
tion from the electrical mains. The electrical connection must be
made according to the details on the rating plate and this operat-
ing manual.
The compressed air supply (input pressure) must not exceed 8 bar.
The unit operator must provide for a shutoff valve in the compressed
air connection line on the customer’s side, allowing disconnection of
the unit from the supply network.