Place the basin at the required position.

Mark the line for the top of the basin (recommended 
to be 800 - 820mm above finished floor level).

Remove the basin, and mark the anchoring points 
50mm below the required top line, and 90mm each 
side of centerline of basin (refer to diagram 1 and 2).

Ensure that the waste and water inlets are in place 
(refer to diagram 3).

Drill 2 holes 9.5mm in the wall (masonry), insert wall 
plugs and screw in the Rag bolts securely. Position 
the basin, and secure to the wall using the nuts and 
washers (refer to diagram 4).

 

If installing into a timber frame, drill a 5mm pilot

 

hole and thread rag bolt directly into timber.

Seal around the sides and top of the basin with a 

V0.1

530*

580*

100*

* RECOMMENDED WATER INLET/OUTLET LOCATIONS

125

400

55

BASIN

CENTRE

LINE

120

MAX

Diagram 1

Diagram 2

Diagram 3

90

750-770

C

L

90

CL

=

=

=

=

125

180

50

Wall  
Plug  

Plastic washer

Nut

Rag Bolt

Basin

Metal washer

Diagram 4

Required Tools

 

Ÿ

Drill

Ÿ

Tape Measure

Ÿ

Spanners

Ÿ

Screwdriver

Ÿ

Hammer

Ÿ

Spirit level