Bathroom Products Australia
2/97 Banksia St.
Botany, NSW, 2019
Tel: 1300 717 717
Fax: 1300 746 480
www.johnsonsuisse.com.au
2/2
INSTALLATION
•
Place the basin at the required position.
•
Mark the line for the top of the basin (recommended
to be 800 - 820mm above finished floor level).
•
Remove the basin, and mark the anchoring points
50mm below the required top line, and 90mm each
side of centerline of basin (refer to diagram 1 and 2).
•
Ensure that the waste and water inlets are in place
(refer to diagram 3).
•
Drill 2 holes 9.5mm in the wall (masonry), insert wall
plugs and screw in the Rag bolts securely. Position
the basin, and secure to the wall using the nuts and
washers (refer to diagram 4).
If installing into a timber frame, drill a 5mm pilot
hole and thread rag bolt directly into timber.
•
Seal around the sides and top of the basin with a
V0.1
530*
580*
100*
* RECOMMENDED WATER INLET/OUTLET LOCATIONS
125
400
55
BASIN
CENTRE
LINE
120
MAX
Diagram 1
Diagram 2
Diagram 3
90
750-770
C
L
90
CL
=
=
=
=
125
180
50
Wall
Plug
Plastic washer
Nut
Rag Bolt
Basin
Metal washer
Diagram 4
Required Tools
Ÿ
Drill
Ÿ
Tape Measure
Ÿ
Spanners
Ÿ
Screwdriver
Ÿ
Hammer
Ÿ
Spirit level