FORM 155.17-N1
ISSUE DATE: 4/1/2013
SECTION 18 – SEALED COMBUSTION
(BURNER FRESH AIR INTAKE DUCT SIZING)
Many codes and regulations stipulate a fresh air in take
ductwork sys tem for burners. It is the ultimate re spon-
si bil i ty of the customer to make sure all national, local
and other applicable codes, restrictions and regula-
tions are satisfied in regards to the burner’s fresh air
intake ductwork.
Due to the many various job-site conditions, materi-
als of construction, and fi nal ductwork design/installa-
tion, this section will not ad dress the ac tu al design and
details of the ductwork.
If a fresh air intake duct is required for the chiller in-
stal la tion, a burner intake adapter flange kit can be
pur chased through a Power Flame representative.
The data found in the “Com bus tion Air Re quire ments”
table (See
), will offer the field
engineer the air intake re quire ments for his burn er at
the proper operating conditions.
For combustion air design temperatures other than
what’s listed in the “Combustion Air Requirements”
ta ble, use the ad just ment pro ce dure in the following
formula:
ACFM = SCFM x 460 + T
AIR
°F
537
where:
ACFM
– Actual Cubic Feet/Minute (corrected for
pressure and temperature)
SCFM
– Standard Cubic Feet/Minute (based at 77°F)
An undersized fresh air intake duct will
sig nifi cant ly reduce the capacity of the
burn er and the chiller. If in doubt regard-
ing the air flow capabilities of a chosen
duct size, the next largest size duct is
recommended.
Summary of Contents for YORK YPC Series
Page 10: ...JOHNSON CONTROLS 10 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 18: ...JOHNSON CONTROLS 18 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ...JOHNSON CONTROLS 20 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 28: ...JOHNSON CONTROLS 28 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 30: ...JOHNSON CONTROLS 30 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ...JOHNSON CONTROLS 34 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 36: ...JOHNSON CONTROLS 36 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...JOHNSON CONTROLS 38 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 46: ...JOHNSON CONTROLS 46 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 50: ...JOHNSON CONTROLS 50 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...JOHNSON CONTROLS 52 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...JOHNSON CONTROLS 54 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 58: ...JOHNSON CONTROLS 58 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 62: ...JOHNSON CONTROLS 62 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 64: ...JOHNSON CONTROLS 64 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...JOHNSON CONTROLS 70 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 78: ...JOHNSON CONTROLS 78 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ...JOHNSON CONTROLS 80 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 84: ...JOHNSON CONTROLS 84 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 93: ...JOHNSON CONTROLS 93 Appendix A Tables A FORM 155 17 N1 ISSUE DATE 4 1 2013 ...
Page 94: ...JOHNSON CONTROLS 94 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 98: ...JOHNSON CONTROLS 98 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...