Operating manual - ComPAC
011769 en 2020.03
35/56
4. Installation information
4.1
General information
For assistance or information about installation, please contact your local Johnson Controls Den-
mark product representative.
4.2
First start-up procedure
Installation in terms of mechanical work (refrigeration system and piping), electrical work and in-
stallation of safety equipment must be performed in accordance with local codes/rules and/or ac-
cording to EN 378-3 and EN 378-4 as minimum requirements.
The pressure loss in the downstream line from the safety valve must meet the values stated in EN
13136 to which EN 378 is referring. The data necessary to dimension the line in accordance with
this standard is stated in the data sheet for the specific unit on page 1 or 2 of this manual.
Make sure that all necessary documents are available including declarations, certificates, identifi-
cation plates, manuals, machine card, logbooks, etc. and/or other documentation required ac-
cording to local rules and/or EN 378.
The main issues/check points for installation of the compressor unit are as follows:
1.
Lifting the unit. Only use the lifting lugs marked with red.
2.
Place the unit with sufficient free space for operation and maintenance in accordance with
GA-drawing.
3.
Place the unit on a foundation suitable for the actual load and vibrations. With or without
vibration dampers according to the vibration design strategy.
4.
Connect all piping. The piping design must include considerations regarding function, sus-
pension, vibrations, thermal expansion and pre-stress after welding in order to avoid high
load on the chiller unit connections. Mount all hoses and valves for compressor cooling.
5.
The safety valves are fitted on the unit from factory. The pipe connection to the valve dis-
charge branch must be made in accordance with existing rules/standards. External piping
and condensers are not protected by the safety valves fitted on the unit.
6.
Leak and pressure testing according to the applied/local codes and rules. Isolate the com-
pressor unit from the test pressure or disconnect the pressure transducers and safety
valves. Never exceed the test pressure of the unit stated on the unit name plate. All chiller
units are pressure tested and performance tested from factory.
7.
Connect power supply wiring (water/brine pumps) according to electrical diagrams.
8.
Make a final check of all relevant components, connections, electrical connections, safety
functions, i.e. safety valve, safety high pressure cut-out (below compressor safety over-
flow valve and not above 0.9 x max. allowable pressure) and the machine room safety
equipment.
Summary of Contents for SABROE ComPAC
Page 1: ...ComPAC Chiller unit with screw compressor Operating manual en...
Page 2: ......
Page 57: ......