background image

364861-UIM-G-1211

22

Johnson Controls Unitary Products

SECTION VIII: COMBUSTION AIR AND 

VENT SYSTEM

COMBUSTION AIR AND VENT SAFETY

This Category IV, dual certified direct vent furnace is designed for resi-
dential application. It may be installed without modification to the con-
densate system in a basement, garage, equipment room, alcove, attic
or any other indoor location where all required clearance to combusti-
bles and other restrictions are met. The combustion air and the venting
system must be installed in accordance with Section 5.3, Air for Com-
bustion and Ventilation, of the National Fuel Gas Code Z223.1/NFPA 54
(latest edition), or Sections 7.2, 7.3 or 7.4 of CSA B149.1, National Gas
and Propane Codes (latest edition) or applicable provisions of the local
building code and these instructions.

COMBUSTION AIR/VENT PIPE SIZING

The size of pipe required will be determined by the furnace model, the
total length of pipe required and the number of elbows required.

Table 7 lists the maximum equivalent length of pipe allowed for each
model of furnace. The equivalent length of elbows is shown in Table 9.
The equivalent length of the vent system is the total length of straight
pipe PLUS the equivalent length of all of the elbows.

The following rules must also be followed:

1.

Long radius (sweep) elbows are recommended. Standard elbows
may be used, but since they have a longer equivalent length, they
will reduce the total length of pipe that will be allowed. Short radius
(plumbing vent) elbows are not allowed. The standard dimensions
of the acceptable elbows are shown below.

2.

The maximum equivalent length listed in Table 7 is for the vent pip-
ing and the air intake piping separately. For example, if the table
allows 65 equivalent feet for a particular model, then the vent can
have 65 equivalent feet of pipe, AND the combustion air intake can
have another 65 equivalent feet of pipe. 

3.

Three vent terminal elbows (two for the vent and one for the com-
bustion air intake) are already accounted for and need not be
included in the equivalent length calculation.

4.

All combustion air and vent pipe must conform to American
National Standards Institute (ANSI) and American Society for Test-
ing and Materials (ASTM) standards D1785 (Schedule 40 PVC),
D2665 (PVC-DWV), F891 (PVC-DWV Cellular Core), D2261 (ABS-
DWV) or F628 (Schedule 40 ABS). Pipe cement and primer must
conform to ASTM Standard D2546 (PVC) or D2235 (ABS). If ABS
pipe is to be used, any joint where ABS pipe is joined to PVC pipe
must be glued with cement that is approved for use with BOTH
materials. Metallic materials must not be used for venting or air
intake.

5.

If a flexible connector is used in the vent system, it must be made of
a material that is resistant to acidic exposure and to at least 225°F
(107°C) temperature. Flexible connectors are also allowed in the
combustion air pipe. 

6.

All models are supplied with 2" (5.1 cm) vent connections. When
the pipe must be increased to 3" (7.6 cm) diameter, the transition
from 2" to 3" must be done as close to the furnace as possible. For
upflow models, the transition from 2" to 3" should be done immedi-
ately above the furnace. For downflow or horizontal models, the
transition from 2" to 3" pipe should be done immediately after exit-
ing the furnace.

7.

In Canada, vents shall be certified to ULC S636, Standard for Type
BH Gas Venting Systems.

8.

In Canada, the first three feet (91.4 cm) of the vent must be readily
accessible for inspection.

9.

For single pipe systems it is recommended to install the combustion
air coupling provided and install approximately 18” (46 cm) of PVC
pipe on the furnace.

10. Minimum vent length for all models is 5 feet (1.5 m).

The “VENT SYSTEM” must be installed as specified in these instruc-
tions for Residential and non-HUD Modular Homes. The direct vent
system is the only configuration that can be installed in a non-HUD
Modular Home.

 This furnace may not be common vented with any other appliance,
since it requires separate, properly sized air intake and vent lines.
The furnace shall not be connected to any type of B, BW or L vent or
vent connector, and not connected to any portion of a factory-built or
masonry chimney
The furnace shall not be connected to a chimney flue serving a sepa-
rate appliance designed to burn solid fuel.

When combustion air pipe is installed above a suspended ceiling or
when it passes through a warm and humid space, the pipe must be
insulated with 1/2” Armaflex or other heat resistant type insulation if
two feet or more of pipe is exposed.
Vent piping must be insulated if it will be subjected to freezing temper-
atures such as routing through unheated areas or through an unused
chimney.

TABLE 7: 

Maximum Equivalent Pipe Length

Model Input 

BTUH (kW)

Pipe Size 

Inches (cm)

Maximum 

Equivalent 

length feet (m)

40,000

2 (5.1)

65 (19.8)

40,000

3 (7.6)

90 (27.4)

40,000

4 (10.2)

150 (45.7)

60,000

2 (5.1)

65 (19.8)

60,000

3 (7.6)

90 (27.4)

60,000

4 (10.2)

150 (45.7)

80,000

2 (5.1)

65 (19.8)

80,000

3 (7.6)

90 (27.4)

80,000

4 (10.2)

150 (45.7)

100,000

2 (5.1)

30 (9.1)

100,000

3 (7.6)

90 (27.4)

100,000

4 (10.2)

150 (45.7)

120,000

2 (5.1)

30 (9.1)

120,000

3 (7.6)

90 (27.4)

120,000

4 (10.2)

150 (45.7)

130,000

3 (7.6)

85 (25.9)

130,000

4 (10.2)

150 (45.7)

Summary of Contents for GG9S*MP

Page 1: ...Typical Combustion Pipe Drain Tee 17 Upflow Configuration 18 Downflow Configuration 19 Horizontal Left Configuration 20 Horizontal Right Configuration 21 Dimensions 23 Home Layout 24 Termination Confi...

Page 2: ...een 55 F 13 C and 80 F 27 C The air filter must be replaced upon substantial completion of the construction process Clean furnace duct work and components upon substantial com pletion of the construct...

Page 3: ...the following using the latest edition available STEP 1 Safety US National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and the Installation Standards Warm Air Heating and Air Conditioning Systems ANSI NFP...

Page 4: ...on FOR FURNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in pa...

Page 5: ...ccess cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order to use...

Page 6: ...uld always be installed on the side desig nated as top side See Figures 4 5 FURNACE ASSEMBLY PC SERIES COILS These upflow coils are designed for installation on top of upflow fur naces only If the coi...

Page 7: ...e seal to prevent air leakage through the unused bottom opening However if the furnace is to be installed on a surface that is uneven or if it is to be installed on blocks or otherwise raised off the...

Page 8: ...ts at three locations to properly sup port the furnace Place one support at the supply end of the furnace one support located approximately in the center of the furnace near the blower shelf and the t...

Page 9: ...binet and Duct Dimensions BTUH kW Input Nominal CFM m3 min Cabinet Size Cabinet Dimensions Inches Approximate Operating Weights A in A cm B in B cm C in C cm Lbs kg 40 11 7 800 22 7 A 14 1 2 36 8 13 3...

Page 10: ...he instructions in this section specify the type of gas approved for this furnace only use those approved gases The instal lation of a drip leg and ground union is required Refer to Figure 16 FIGURE 1...

Page 11: ...aced on the octagon hub located on the gas inlet side of the valve Placing a wrench to the body of the gas valve will damage the valve causing improper opera tion and or the valve to leak Table 5 Nomi...

Page 12: ...e as shown in Figure 17 Electronic thermo stats may require the common wire to be connected Apply strain relief to thermostat wires passing through cabinet If air conditioning equip ment is installed...

Page 13: ...ressor G Fan PP11C70224 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Clipping Jumper W914 for electric heat on thermostat is not necessary 24VAC Humidifier Optional C...

Page 14: ...S HGD HP RHS O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot W1 66 out Heat Y Compressor DEMAND DEFROST CONTROL X L Malfunction Light W Auxiliary Heat SINGLE STAGE HEAT PUMP 1 1 Par...

Page 15: ...n stream from the furnace that operates on W2 will be supplying cold air in the Heating mode to the occupied spaces unless W2 is energized GAS PIPING Furnace gas supplies must be provided as specified...

Page 16: ...rom the TWIN terminal of Furnace 1 to the TWIN terminal of Furnace 2 3 Install a separate 24V relay as shown in the diagram below Use of this relay is required as it ensures that the transformers of t...

Page 17: ...tch vacuum hose How ever ensure that all pressure switch hoses are routed such that they prevent any condensate from entering the pressure switch To Open Or Vented Drain Tee 5 Min Open Stand Pipe Anti...

Page 18: ...will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose Move rain gutter hose to t...

Page 19: ...tch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose to...

Page 20: ...e switch hose to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this po...

Page 21: ...the 90 fitting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to...

Page 22: ...d to PVC pipe must be glued with cement that is approved for use with BOTH materials Metallic materials must not be used for venting or air intake 5 If a flexible connector is used in the vent system...

Page 23: ...OMBUSTION AIR VENTING FIGURE 29 Dimensions TABLE 8 Elbow Dimensions Elbow A Dimension 2 Standard 2 5 16 3 Standard 3 1 16 2 Sweep 3 1 4 3 Sweep 4 1 16 TABLE 9 Equivalent Length of Fittings Fitting Equ...

Page 24: ...quirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local i...

Page 25: ...on on air source from inside the building The vent for a single pipe system must be installed as specified in the venting section of these instructions with the vent terminating as shown in Figure 31...

Page 26: ...Air Supply for proper installa tion Refer to Figure 27 3 VENTILATED COMBUSTION AIR Combustion air is supplied through a PVC or ABS pipe that is connected to the PVC coupling attached to the burner bo...

Page 27: ...e 4 A automatically operated damper or automatically adjustable lou vers shall be interlocked so that the main burner cannot operate unless either the damper or the louver is in the fully open positio...

Page 28: ...d in the enclosure b Not less than the sum of all vent connectors in the confined space 3 The duct shall be least the same cross sectional area as the free area of the air supply inlet opening to whic...

Page 29: ...are not in operation 1 Inspect the venting system for proper size and horizontal pitch Determine that there is no blockage restriction leakage corrosion or other deficiencies which could cause an uns...

Page 30: ...ate mea surement of gas flow 4 Refer to Table 14 for cubic feet of gas per hour 5 Multiply cubic feet per hour by heating valve BTU cu ft to obtain input If clocked rate does not match the input rate...

Page 31: ...300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232...

Page 32: ...ies on and follow the operating instruc tions to place the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After th...

Page 33: ...long enough to adequately cool the furnace but not so long that cold air is blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown i...

Page 34: ...4 Medium Low 1232 1313 1291 1280 1250 1209 1207 1148 1055 937 Low 826 821 853 858 838 817 794 776 760 711 80 2200 C High 2529 2435 2338 2256 2162 2041 1920 1794 1654 1501 Medium High 2166 2111 2070 20...

Page 35: ...1483 1353 1209 Medium High 1543 1543 1516 1504 1477 1446 1382 1309 1202 1099 Medium Low 1238 1241 1243 1241 1252 1242 1201 1140 1074 967 Low 906 902 903 910 888 866 859 829 795 743 80 2200 C High 258...

Page 36: ...leted between terminals R and W of the thermostat When the proper amount of combustion air is being provided the pressure switch will close the ignition control pro vides a 17 second ignitor warm up p...

Page 37: ...ed Flashes description below If the main limit switch opens five times within a single call for heat the control will also indicate 4 Red Flashes and will enter a one hour soft lockout 5 RED FLASHES T...

Page 38: ...ash three green flashes when the memory has been cleared then will resume the normal slow green flash after a five second pause SECTION XII REPLACEMENT PARTS LIST DESCRIPTION MOTOR MOTOR DIRECT DRIVE...

Page 39: ...r motor speed connections shown are typical but may vary by model and application LEGENDE DS Commutateur de porte MOT Moteur soufflerie TST Thermostat ROS Commutateur de roulement IDM D induct moteur...

Page 40: ...ge without notice Published in U S A 364861 UIM G 1211 Copyright 2011 by Johnson Controls Inc All rights reserved Supersedes 364861 UIM f 0511 Johnson Controls Unitary Products 5005 York Drive Norman...

Reviews: